How Did Affirmed Networks Reduce ECO Cycle Times By 90%?

Affirmed Networks is transforming mobile. With Arena’s cloud-based PLM solution, Affirmed eliminated silos and increased team visibility to keep all teams on the same page.

Using streamlined ECO processes, engineering change cycle times were reduced by 90%.

By providing controlled access to the product record, Arena reduced product design confusion and versioning.

In addition, Arena produced the following results:

  • Reduced engineering cycles by 90%
  • Eliminated need for costly five-person IT management team
  • Boosted sales enablement processes