How Did Affirmed Networks Reduce ECO Cycle Times By 90%?
Affirmed Networks is transforming mobile. With Arena’s cloud-based PLM solution, Affirmed eliminated silos and increased team visibility to keep all teams on the same page.
Using streamlined ECO processes, engineering change cycle times were reduced by 90%.
By providing controlled access to the product record, Arena reduced product design confusion and versioning.
In addition, Arena produced the following results:
- Reduced engineering cycles by 90%
- Eliminated need for costly five-person IT management team
- Boosted sales enablement processes