This whitepaper outlines three product change management realities which may be holding you back and five fixes to rescue your change process.
Download this whitepaper and learn how to accelerate ECO turnaround by 80 percent.
Often small to medium-sized businesses make do with the tools they have to manage their product data. Paper, spreadsheets and email are often used throughout the product development and engineering change management processes. These tools can wreak havoc when product information is released into production.
But there’s no need to settle for inefficient, frustrating product change management. There are other options to help control product information and share changes across the organization and supply chain.
This whitepaper outlines three product change management realities which may be holding you back and five fixes to rescue your change process.
Download this whitepaper and learn how to accelerate ECO turnaround by 80 percent.
(Spreadsheets) were a nightmare. So, it was a great joy and pleasure to implement Arena because all of a sudden everything could be put within the structure of a tool that was completely revision controlled, paperless and was accessible via the web so that our subcontract manufacturers or system administrators could access anytime with the most current information or data.— Mike Park, Director of Operations
Arena pioneered cloud PLM applications. The company’s products, including BOMControl, PartsList and PDXViewer, enable engineering and manufacturing teams and their extended supply chains to speed prototyping, reduce scrap, and streamline supply chain management. Arena cloud PLM applications simplify bill of materials and change management for companies of all sizes, and offer the right balance of flexibility and control at every point in the product lifecycle—from prototype to full-scale production. Based in Foster City, Calif., Arena holds a spot on the San Francisco Business Times for ‘Best Places to Work’ in 2013.