This article defines engineering change orders, describes the role of the engineering change order in product design and manufacturing and provides downloadable templates so you can create your own ECO sample form.
An engineering change order (ECO) is a documentation packet that outlines the proposed change, lists the product or part(s) that would be affected and requests review and approval from the individuals who would be impacted or charged with implementing the change. ECOs are used to make modifications to components, assemblies, associated documentation and other types of product information.
The change process starts when someone identifies an issue that may need to be addressed with a change to the product. It ends when the agreed-upon change is implemented. ECOs are used in between to summarize the modifications, finalize the details and obtain all necessary approvals.
See for yourself why so many small and mid-size manufacturers have switched to Arena from
spreadsheet-based BOM and change management.
Register now and enjoy unlimited access to Arena for the next 10 days
Someone identifies a problem or issue and determines that it may require a change. The scope of the issue and its possible impact are estimated.
An engineering change request (ECR) is created to examine the necessity and feasibility of the change, to identify parts, components and documentation that might be affected, to estimate costs and to list the resources required to implement the change.
The ECR is circulated for review and discussion among key stakeholders and is modified as needed.
Once the ECR is approved, an engineering change order (ECO) is generated, which lists the items, assemblies and documentation being changed and includes any updated drawings, CAD files, standard operating procedures (SOPs) or manufacturing work instructions (MWIs) required to make a decision about the change.
The ECO is then circulated to a change review board made up of all stakeholders (including external partners when appropriate) who need to approve the change.
Once the ECO has been approved, an engineering change notification/notice (ECN) is sent to affected individuals to let them know that the ECO has been approved and the change should now be implemented.
Those responsible for implementation use the information in the ECO and ECN to make the requested change.
While an engineering change order is used for changes that are executed by engineering, other types of change orders may be used by other departments. These include the:
A change order describing modifications to the manufacturing process or equipment.
A change order detailing modifications to documents, specifications or SOPs.
While you may groan at the prospect of pulling together another set of documentation, an ECO is a critical part of keeping product development on track and making sure product information is accurate. A good ECO contains the full description, analysis, cost and impact of a change, and a good ECO process ensures that all stakeholders have bought in to the change. Having an organized method of handling product changes reduces potential design, manufacturing and inventory errors, minimizes development delays and makes it easy to get input from different departments, key suppliers and contract manufacturers.
Following good ECO practices also makes it easy to document a full history of what changes have been made to a product and when they occurred. In industries with regulatory requirements, like the medical device industry, having a full history of every change to a product is mandatory. (Depending on the industry, change orders and even the change process itself may be audited by a regulatory body.) Keeping a record of product changes will also help you debug any problems that occur after your product launches. The task of identifying and fixing the root cause of any problem is easier when you have a complete product change history.
Without a clear ECO process in place, making a change to a product can set off a chain of costly, time-consuming and avoidable events. Take a part switch that happens late in the development process. Engineering may tell manufacturing to be aware of the new part, but if that information is never conveyed to the purchasing department, the old part will be ordered. When the components arrive, manufacturing will not be able to assemble the product, and its launch will be delayed until the new part is obtained (most likely with some rush charges incurred along the way).
Engineering change orders make it possible to accurately identify, address and implement product changes while keeping all key stakeholders in the loop and maintaining a historical record of your product. Without them, miscommunications occur that lead to delays, incorrect purchase orders and improper product builds.
| Managing ECOs With Paper/Manila Folders | Managing ECOs With Electronic Systems | |
| Cycle Time |
|
|
| Signature Process |
|
|
| Issue Resolution |
|
|
| Package Format |
|
|
Companies need to be able to adapt quickly in today’s constantly changing environment, and often that means making changes to their products. Engineers make modifications during development and production with the intent of adding functionality, improving manufacturing performance or addressing the availability of a particular part. To make sure proposed changes are appropriately reviewed, a solid process is critical—especially if members of your product team are scattered across multiple locations (for instance, design engineers in Boston, the manufacturing team in St. Louis and component manufacturers all over the world). At the heart of a solid change process is the engineering change order.
©2012 Arena Solutions, Inc. Arena and Arena Solutions are trademarks of Arena Solutions, Inc., Reg. U.S. Pat. & Tm. Off. All rights reserved. Other product and company names are the property of their respective holders. Contact Arena at questions@arenasolutions.com for permission to repost or syndicate this content.
Ready to start? Try Arena free for 10 days. Sign up